Accenture subsequently triggered the Phase 2 block of 185,000 sft - overlooking the lake in 2008. Optimization of the services infrastructure after careful study of usage pattern have enabled centralized infrastructure of power and air conditioning systems lead to significant operational cost benefits for the client. As a crowning value-add, an ornamental and recreational feature - an open amphitheater was created at the entrance of this phase. Accenture commenced operations in this phase in 2009.